Eight Mile Plains to Daisy Hill
SectorTransport, Urban
ClientDepartment of Transport & Main Roads
LocationPacific Motorway, Daisy Hill
DurationAugust 2019 – July 2020
Contract Value$4.5M

The Eight Mile Plains to Daisy Hill upgrade will improve 8kms of the Pacific Motorway (M1) between the Gateway Motorway and Loganlea Road. The project is the second stage of the M1 North upgrade program being delivered in a 3-stage rolling program from north to south.

 

PROJECT OVERVIEW

Demolition and removal of approximately 50 commercial and residential structures to facilitate the main upgrade project.
Management of PUP service and photovoltaic (solar) system disconnection to all properties requiring demolition (including all coordination with local authorities and PUP asset owners)
Pre-demolition asbestos audits to all commercial and residential structures (including but not limited to buildings, dwellings, swimming pools, sheds, and any other structures) to be demolished.
Safe removal and disposal of asbestos containing materials at all sites prior to demolition, including some friable asbestos.
Air monitoring during handling and removal of asbestos containing materials and provision of clearance certificates upon completion.
Supply, placement, and compaction of clean general fill materials to backfill depressions at properties following demolition works.
Supervision, access, and traffic management.
Three noise walls (3m-6m high), totalling approximately 600m; and associated reinstatements of adjacent property backyard landscaping.
Alternative noise treatment (Airconditioning).
Relocation and / or replacement of large business advertising signage to pre-empt resumptions  
McIlwain was engaged for the Early Works package which comprised the demolition and removal of all commercial and residential structures (including but not limited to buildings, dwellings, swimming pools, sheds foundations and any other structures (above and below ground); and construction of three noise walls the as required to facilitate the main works program delivered by others.
<
>

Transport

We pride ourselves on delivering optimal transport infrastructure throughout Queensland and NSW.

READ MORE

Building

McIlwain provide high-quality solutions that are designed to be both cost-effective and fit for purpose.

READ MORE

Urban

Working collaboratively with consultants, developers and councils to deliver urban infrastructure.

READ MORE

FEATURE PROJECT

Coomera Connector Stage 1 Central

Sector
Transport, Urban

Client
Department of Transport and Main Roads

Location
Helensvale to Molendinar

READ MORE

Search Projects

Region

Project Status


Sector/s

Mount Victoria Slope Remediation

Oakey Roads and Carpark Resurfacing

Hampton Downslope Remediation

Coomera Connector Stage 1 Central

Rockhampton Bruce Highway Intersection Upgrade

Cunninghams Gap Reconstruction Project

Burleigh to Palm Beach Motorway Upgrade

Deodar Drive Stormwater Upgrades

South Coast Region Natural Disaster Program

Beechmont Road (South Coast Natural Disaster Program)

Tully Timber Bridge Replacement

D’Aguilar Highway Wide Centreline Treatment

LOAD MORE