Bunya Road Bridge
SectorTransport, Utilities
ClientMoreton Bay Regional Council
LocationBunya Road, Draper
DurationMay 2017 - February 2018
Contract Value$5M

This $5.0M project forms part of MBRC’s $536.0M plan which will see improvements to road safety, flood mitigation and community facilities throughout the Moreton Bay region.

 

PROJECT OVERVIEW 

Clearing and grubbing
All Excavations - 12,628m3
Road Embankment - 2,151m3
Unbound Pavements - 2,735m3
Prime, grade [AMC0] - 4,900m2
Seal, class [C170] - 4,900m2
Heavy Duty Dense Grade Asphalt - 4900m2
Structural Concrete - 571m3
Prestressed concrete deck & kerb units (1050 x 26930) - 45no.
PUP removal, relocation and Installation
Stormwater Drainage
Road Lighting
Electrical
Soil nailing
Pavements & Footpath
Landscaping
Project works include the construction of a three span road bridge over South Pine River, Draper with precast concrete deck units including traffic rails and barriers. Approach works includes realignment of the existing road, construction of drainage, landscaping and revegetation works.
Throughout construction McIlwain successfully coordinated relocation of Telstra’s trunk utility service. South Pine River and environs have high environmental value and is a known habitat for platypus, rainbow bee-eater bird and other fauna. As part of the April 26, 2017 preclear survey to determine presence, one experienced platypus ecologist/fauna spotter conducted physical searches, from within the water, along both river banks, utilising an aquatic, submersible borescope camera to investigate potential den entrances and nocturnal monitoring of the water surface within the site, and 100m either side of the site limits, with a Thermal Imaging Camera.
<
>

FEATURE PROJECT

Coomera Connector Stage 1 Central

Sector
Transport, Urban

Client
Department of Transport and Main Roads

Location
Helensvale to Molendinar

READ MORE

Search Projects

Region

Project Status


Sector/s

Oakey Roads and Carpark Resurfacing

Hampton Downslope Remediation

Coomera Connector Stage 1 Central

Rockhampton Bruce Highway Intersection Upgrade

Cunninghams Gap Reconstruction Project

Burleigh to Palm Beach Motorway Upgrade

Deodar Drive Stormwater Upgrades

South Coast Region Natural Disaster Program

Beechmont Road (South Coast Natural Disaster Program)

Tully Timber Bridge Replacement

D’Aguilar Highway Wide Centreline Treatment

Binna Burra Bushfire Recovery Works

LOAD MORE