Veloway V1SE
SectorTransport, Utilities, Urban
ClientDepartment of Transport & Main Roads (TMR)
LocationHolland Park West/Tarragindi
DurationJuly 2018 - February 2019
Contract Value$26.6M

The Veloway 1 (V1), is a dedicated cycleway running between Lower River Terrace, South Brisbane and Eight Mile Plains. The 17km cycleway provides a safe and efficient route for people travelling by bike.

 

PROJECT OVERVIEW 

BCC / DTMR specifications / standards
1.6km dedicated cycleway
Three bridge connections (32 pier, column, headstock configuration (bored piles)
68 bridge girders (Super-T) up to 100t each
7000m3
Four new connections to local roads (Bapaume Road, Peronne Road, Gaza Road and Birdwood Road)

Upgrades to the V1 are being made in stages to remove multiple road crossings and to improve safety where on-road crossings still exist. Complete and open for use is:
Stage A – Logan Road (exit 14) to Miles Platting Road
Stage B – Miles Platting Road to Gateway Motorway off-ramp, Eight Mile Plains
Stage C – Lewisham Street at Greenslopes to Birdwood Road at Holland Park West
Stage D – O'Keefe Street to Lewisham Street
Stage E – Birdwood road to Gaza Road.
McIlwain constructed Stage E—the largest single package of works which provides approximately 1.6km of dedicated cycleway between Birdwood Road, Holland Park West, and Gaza Road, Tarragindi.  Stage E includes three bridge crossings over Marshall Road, Sterculia Avenue and Bapaume Road near Gaza Road.
<
>

FEATURE PROJECT

Coomera Connector Stage 1 Central

Sector
Transport, Urban

Client
Department of Transport and Main Roads

Location
Helensvale to Molendinar

READ MORE

Search Projects

Region

Project Status


Sector/s

Oakey Roads and Carpark Resurfacing

Hampton Downslope Remediation

Coomera Connector Stage 1 Central

Rockhampton Bruce Highway Intersection Upgrade

Cunninghams Gap Reconstruction Project

Burleigh to Palm Beach Motorway Upgrade

Deodar Drive Stormwater Upgrades

South Coast Region Natural Disaster Program

Beechmont Road (South Coast Natural Disaster Program)

Tully Timber Bridge Replacement

D’Aguilar Highway Wide Centreline Treatment

Binna Burra Bushfire Recovery Works

LOAD MORE